Crystal River Energy Complex:
Power Plant On The Gulf Coast
The Crystal
River Energy Complex is a literal city unto itself. With both
nuclear and coal-fired electrical production, the complex
includes 5 facilities on the Gulf coast of Florida, north of
Tampa-St. Petersburg. And they are right on the coast, so salt
water, along with coal dust and other corrosives are a constant
problem for their HVAC/R equipment.
Up until a few years ago, Crystal River
did not specify any special coating for their units. They were
constantly repairing or replacing units due to problems caused
by the corrosiveness of the environment. As Jim Cole, HVAC Tech
tells it, they began to hear about Bronz-Glow from HVAC techs,
contractors, and wholesale companies they dealt with.
"Bronz-Glow was highly-recommended by them all, especially Tampa
Bay Trane, who we ordered our units through."
In 2002 they replaced an 89-ton chiller
unit in their Number 5 Precipitation Room, the industry name for
a room with breakers and high-voltage electrostatic filters.
These are the filters that remove impurities from the air, and
they must be kept cool or they will overheat rapidly, causing a
chain reaction of problem.
"We also replaced a 50-ton chiller at
our CR-4 Administration building, and 2 30-ton DX systems at
their 480 Switch Gear Room. We coated all of these with
Bronz-Glow.
"For some reason we weren't able to coat
a 120-ton chiller in our Control Room or another 105-ton chiller
at our Electric Shop. Both of these are less than three years
old and already are falling apart from the corrosion."
They plan to replace a 100-ton chiller
system at their CR-3 Admin Building next year. Will they specify
Bronz-Glow? "I'm very happy with Bronz-Glow. This chiller unit
has needed replacing for several years… I don't want the new one
to wear out from all the corrosion like the old one did. I
recommended they get Bronz-Glow on it as well."
Back
|